Swabs Developments was appointed to upgrade the safety measures in a large warehouse for a local medical facility. Our involvement spanned from the planning stage through to final handover, ensuring a seamless and efficient project delivery. The scope of work included the installation of over 400 metres of McCue Safety Stop Pedestrian Ground Barriers to enhance pedestrian safety, alongside the application of designated anti-slip resin walkways to minimise hazards. Additionally, we installed McCue Shock Absorbing Rack Guards and Safety Stop Rack End Protection to safeguard the high-level racking and prevent potential damage. This comprehensive safety upgrade ensures a secure and efficient working environment for the facility.